Home Installation
Installers can use our online portal to generate estimates and present them to homeowner/clients electronically.
In addition, installers can manage projects and communicate status of a home installation. Your project coordinators can use our online project management tools to update the status of work items from planned to scheduled to complete.
Installers and project coordinators can upload images to a project gallery, allowing homeowners to view progress.
Lot Preparation
Clearing and grubbing
Remove trees, roots and grass within the lot pad.
1,500
Erosion and runoff control
Install erosion and runoff control; 3 ft. x 100+ ft. silt temporary fencing required by most locales.
500
Tree protection fencing
Some locales require temporary fencing around existing trees on the lot to ensure protection from construction equipment.
400
Lot Preparation - Total
2,400
Lot pad
Options: crushed concrete (recommended); 50/50 sand mix.
Pad material
Material used to create the base that the home foundation resides on.
Amount
The amount of material required for lot pad.
4,000
Spread
Spread and compact material with crest to drain water.
500
Pad material - Total
4,500
Home setup
Permit
Attain permit from local authority for home setup and utility connections.
1,500
Position home on lot
A home position is approved by a mobile park board or local authority/permitting office.
500
Block piers
Cinder block piers with ABS footer pads or concrete footers. Pier spacing for new homes is provided by the manufacturer. Pier spacing for used homes without a pier spacing diagram provided by the manufacturer of the home follows Rule 15C-1 of the Florida Administrative Code (FAC).
1,500
Longitudinal and lateral stabilization
Longitudinal tie-downs resist horizontal wind loads at the end wall of a home. Lateral tie-downs prevent horizontal sliding of a home from wind loads at the side wall of a home.
2,500
Hurricane anchors
Hurricane anchors at 4'(feet) separation on the exterior; anchors along marriage line.
1,500
Vapor barrier
6 mil polyethylene vapor barrier above lot pad material.
400
Close up siding
Install siding at the front and back of home.
3,000
Home setup - Total
10,900
Utilities
Plumbing
Supply and wastewater connections
Relocate wastewater connector
Reposition or replace wastewater connector to main sewer line.
1,000
Relocate supply water connector
Reposition or replace connector to main water supply pipe.
2,000
Connect supply water
Connect supply water under home to supply water line.
1,000
Connect wastewater
Connect wastewater plumbing dropouts under home to main wastewater line.
3,000
Plumbing - Total
7,000
Electrical
Relocate electrical pedestal
Relocate the position of the electrical pedestal.
1,000
Connect subpanel to pedestal
Connect electrical panel (also referred as the subpanel) inside home to electrical panel outside of the home.
2,000
Electrical - Total
3,000
HVAC
Exterior unit pad
Relocate the position of the electrical pedestal.
1,000
Connect exterior HVAC unit to interior
The HVAC system can be a split system with multiple interior zones; a combined exterior unit; or an interior air handler system with an exterior air conditioner or heat pump unit.
2,000
Air handler
The air handler unit can be installed as a separate unit within an air handler closet inside the home or as part of a packaged air handler/condenser unit external to a home.
2,000
Condenser unit
the outdoor portion of an air conditioner or heat pump.
4,000
HVAC - Total
9,000
Skirting
Options: vinyl siding; bricks.
Permit
Some cities or counties require a permit for skirting.
500
Materials
Materials include pressure-treated (PT) lumber, fasteners (bolts, screws and nails), brackets.
4,000
Construction
The labor required to construct exterior stairs.
3,000
Skirting - Total
7,500
Exterior stairs
In most cases, two exterior stairs are required for a home.
Permit
Some cities or counties require a permit for skirting.
500
Materials
Materials include pressure-treated (PT) lumber, fasteners (bolts, screws and nails), brackets.
2,000
Construction
The labor required to construct exterior stairs.
3,000
Exterior stairs - Total
5,500
Additions
Shed
A shed connected to the side of the home or free-standing.
6,000
Carport
A carport connected to the side of the home that contains a host beam (i.e. ledger board).
11,000
Driveway extension
If a driveway exists, a mobile park or local authority/permit office needs to approve of a driveway extension length, width or both.
3,000
Additions - Total
20,000
Parkhome
Created
May 1, 2024
Last modified
Aug 20, 2024
Estimate Total
$69,800